Technical & Admins Staff

 

TECHNICAL CORES

SENIOR PROJECT MANAGER (ELECTRICAL)

Name: Hj. Muhammad Esa bin Ibrahim

Age: 55 years

QUALIFICATIONS

·    Masters Degree in Science from The Brunel University of West London, United Kingdom

·    Bachelor of Electrical Engineering from University Teknologi Malaysia

·    Certificate in Leadership & Organizational Management from Institut Tadbiran Awam Negara (INTAN).

         EXPERIENCES

·    Electrical engineer with JKR – Public Work Department – 1978

·    Electrical Engineering Lecturer at University Technology Malaysia (1979 – 1992), an Entrepreneur (Electrical Contractor) and Seminar Leader in Electrical Contracting Business for Malaysia and Brunei.

·    Infrastructure facility for MIG 29 and F/A-18D Air Force Base Butterworth worth RM 1,525,926.00.

·    Waste water treatment of Putrajaya project of about RM2,698,865.00

·    M&E work for shop house building for Telekom, Johor Bahru Project worth RM 1,835,000.00.

·    IKBN Campus (Skill & Training Institute – A Public Work Department’s Project) Pagoh, Johor Malaysia.

·    RM 1.85 Million.project of proposed an 18th Storey Medium Cost Condominium, PPRT Jalan Ipoh.

·    Project management, cost control and procurement, costing & negotiation and investment opportunity in Malaysia, Brunei Darul Salam, Dubai, Sharjah and  and Middle East.

 

ELECTRICAL ENGINEER (1)

Name: Muhammad Ghazali Tahir

Age: 32 years old

QUALIFICATIONS

·    M.Sc. in Computer and Information Engineering International Islamic University Malaya – currently pursuing part time course

·    B.Sc. (Electrical engineering),The George Washington University,Washington D.C, USA -May 1997

·    America Associate Degree (Electrical Engineering)Dec 1997

 EXPERIENCES

·    2005-2007: ZALNET SDN BHD: Project Manager Responsible for monitoring, scheduling and reporting of all Project activities undertaken by the company to the board of directors. Prepare Project summary, proposal paper for the clients. Prepare Prelim Detail Abstract and construction budget including operational, project management, training and manpower requirement, Construction supervision on the ICT networking and infrastructures.

·    2000-2005: University Kuala Lumpur-BMI ; LecturerTeaching information and communication technology courses for Higher National Diploma student in UniKL-BMI. Conduct Certified Training for CCNA (Cisco Certified Network Administrator) and LPI (Linux Professional Institute) 101, 102, and 202. Serverworx Open Source Contributor. Build and Design Linux Server codename Serverworx from Open Source Sun Cobalt Qube 3 code Centos 4.2.

·    Jun 1999-Dec 1999: British Aerospace, Preston UK : Visual C++ Programmer Upgrading avionics aircraft computer aided training software

·    Mac 1998-July 1998: Propaducon Engineering (M) Sdn.Bhd, Ampang -Operation Engineer. Supervised the production and development of satellite dish manufactured in factory. Responsible in materials’ purchasing and quality of product in and out from the factory.

 

 

 

ELECTRICAL ENGINEER (2)

Ir. Khamsah Rais 

 

EDUCATIONAL & PROFESSIONAL BACKGROUND      

 

2.1. Bachelor in Electrical Engineering from UniversityMalaya, 1997

 

2.2. Professional Engineer (PE NO; 13196) – Board of EngineersMalaysia(BEM)

 

2.3. Institution of Engineers Malaysia, IEM  membership no: M27499

 

2.4. Project Management Instuitute – Malaysian Chapter

 

 EXPERIENCES

 

2.5. To date: ESHA ENGINEERING CONSULTANTS –Design Engineer

 

2.7. 2003- 2005 : KLIA CONSULTANCY SERVICES SDN BHD

 

2.8. 1997-2002 : RANHILL BERSEKUTU SDN BHD

 

 PROJECTS HANDLED:

 

 2.1. ProposedSOCSORehabilitationServiceCenter, Jasin Melaka (consists of Disability Management office, Medical Rehabilitation,VocationalCenter,TrainingCenterand Accommodation Blocks)

 

2.2. Proposed UiTM Cawangan Terengganu, Kampus Bukit Besi

 

2.3. New M&R workshop For Prime-mover and Spreaders andRTGBaysat CT4 Westports, Pulau Indah.

 

2.4.Kuala Lumpur–Putrajaya Highwayfor Maju Holdings

 

2.5. Duta-Ulu Klang Expressway for Ekovest Sdn Bhd

 

2.6. SIDEL Factory in ShahAlam

 

2.7.ContainerTerminalWharf2 and 33kV Main Distribution forWestportDevelopment, Pulau Indah, Perlabuhan Klang, Selangor Darul Ehsan.

 

2.8. Project :Integrated Transport Information System, (ITIS) for Dewan Bandaraya Kuala  Lumpur

 

2.9. 3 Storeys Office andCommercialBuildinginPenangfor Mesiniaga Bhd.

 

2.10.         KWSPTrainingCenter, Bandar Baru Bangi.

 

2.11.          Sime Darby Park, Jalan Binjai Kuala Lumpur for Permodalan Nasional Berhad.

 

2.12.          Mixed Development at Bukit Cerakah, Selangor & Mixed Development for Bandar Mahkota Cheras.

 

2.13.          Infrastructure Development and Residential Bungalow of Precinct 10, Putrajaya

 

2.14.         Muar Bypass RoadandSg.MuarBridge.

South Klang Valley Expressway (SKVE) Section 1A

 

ELECTRICAL ENGINEER (3)

 

Name: Nurul Hani binti Ramli

 

Edu. Background

1st Highest Edu. : Master Science of Engineering Mathematics

Instituition/College: Universiti TeknologiMalaysia

Grad Date: Sept 2011

 2nd Highest Edu. : Bachelor’s Degree of Electrical Engineering with Honors

Instituition/College: Universiti Tun Hussien OnnMalaysia(UTHM)

Grad Date: August 2008

 3rd Highest Edu. : Matriculation

Instituition/College: MatriculationCollegeofNegeri Sembilan

Grad Date: April 2004

 4th Highest Edu. : Sijil PelajaranMalaysia

Instituition/College: SMT Kuala Lumpur, Cheras

Grad Date: 2002

 Employment History

Company’s Name :TransportmanagementCenter, Dewan Bandaraya Kuala Lumpur

Specialization: Electrical Engineering

 SENIOR PROJECT MANAGER (MECHANICAL)

Name: Ahzan bin Saad

Age: 49 years

QUALIFICATIONS

·    ( 1983-1985) BSc. Degree in Mechanical Engineering from University of Glasgow, United Kingdom

·    ( 1980-1982) Diploma in Mechanical Engineering from University Technology Malaysia, Jalan Gurney, Kuala Lumpur

·    (1985) INTAN, Jalan Elmu, KL, – Integraton and management

·    IKRAM Bangi, -air-conditioning, diesel engine, building services, hospital equipments, quarry machine and maintenance, building and road maintenance.

·    (1991-1992) UMW Toyota, -maintenance backhoe loader & shovel.

·    (1991) India, Phalghat – water pumps and fabrication

·    (Jan 1997)  Training in factory Milwaukee, USA

·    (July 1997) Training in factory Brighton, United Kingdom.

·    (September 1997)

·    Training in factory Taichung, Taiwan

EXPERIENCES

·    2008 :  AL-RAQIA MEDICAL TECHNOLOGY LTD – LIBYA : Mechanical Engineer — Design, supervision, draughtsman ACAD  on mechanical and electrical system for Al-Wahda Hospital , Darnah, and Tripoli Medical Centre,Libya.  Scope of works including consultancy services Al-Raqia Medical Technologies.

·    2004: SENIE ASSOCIATES: Senior Consultant (M&E) — senior consultant for project management, constructions, specifications, design and maintenance. Among the projects was police headquarters complex by BLT Management & Construction Sdn Bhd.

·    (1999-2004): SBR POWER SDN BHD: Project Manager — Responsible for installation of hot water boiler system (central and standalone system) for Hospital Tanah Merah, Kota Bahru, Kajang, Banting, Jertih Terengganu, Jitra Kedah, Muar, Pontian Johor. Maintenance of fire protection system, hose reel and CO2 system. Perbadanan Air Melaka, – Maintenance of high lift and booster pump system for Loji Air Bertam Melaka.

·    (1998-1999) VAMED ENGINEERING (M) SDN BHD: M&E Consultant — Project management Team – A Lead consultant for mechanical and electrical services for Putrajaya Hospital and Health Clinic.

·    (1997-2002) TUNAS SELATAN CONSORTIUM SDN BHD: M & E Project Manager — Responsible for the management, project planning and implementation of redevelopment of Hospital Sungai Buloh, Selangor. Scope of work involved from initial inspection, architectural, contract implementation, costing and consultation. Coordination with consultant, planning and interaction meeting with JKR, and MOH. Leading the M&E teamwork.

·    (1996-1997) JKR TURNKEY UNIT, KUALA LUMPUR: Mechanical Engineer — Head of design mechanical and electrical services in hospital Selayang. Responsible for the planning and prepare pre-bid documents mechanical specifications for 21 new build hospitals in Malaysia. (1996-2001): JKR MECHANICAL IPOH, PERAK: Mechanical Engineer — Workshop and building maintenance manager. Project Engineer for Blok Polyclinic Hospital Ipoh, Hospital Grik, Bangunan Persekutuan Taiping, Maktab Perguruan Sul;tan Idris Shah, Tanjung Malim, Wad Bersalin, Hospital Taiping, Wad Hospital Bahagia Tanjung Rambutan.

·    (1991-1996) JKR MECHANICAL ALOR SETAR KEDAH: Mechanical Engineer — Head of the maintenance groups for hospital Yan, Sungai Petani, Alor Setar, Kulim, Baling, Sik and Jitra. Project Coordinator (M&E) for new Hospital Langkawi , Kedah darul Aman. Maintenance JKR’s plant and vehicles.

·    (1985-1988): JKR WORKSHOP PERSEKUTUAN KUALA LUMPUR : Mechanical Engineer — Maintenance JKR’s plant and vehicles

·    (1982-1983) PUSAT PENYELIDIKAN ATOM TUN ISMAIL (PUSPATI) BANGI, SELANGOR : Assistant Engineer

 

MECHANICAL ENGINEER (2)

WAN MOHD HAFIZQ BIN WAN SAPIANSORI

Personal Particulars & Preferences

 Current Position            : Mechanical Engineer 

 Highest Education       : Bachelor’s Degree in Engineering (Mechanical)

 Institute/University        : Universiti Teknologi Mara (UiTM),Malaysia

 Years of Experiences  : 2

 Diploma of Engineering (Mechanical)

 Institute/University        : Universiti Teknologi Mara (UiTM),Malaysia

CLERK OF WORK (M & E)

 

 Ahmad Faizal Bin Arshad

 

Age:40 tahun

 ACADEMIC QUALIFICATION

 

  1.  Diploma Mechanical Engineering  (Kolej Teknologi MIDAS)  -  1990-1992
  2. Sijil Pelajaran Malaysia (Sek. Men. Teknik Melaka) –  1987-1988
  3. Sijil Rendah Pelajaran (Sek. Men .Parit Bunga Muar) – 1985-1987

 

 working experiences: 15 years as clerk of works and site supervisor

CLERK OF WORK (Mechanical)

Name: Mohd Khairi bin Abdullah

Age: 30 years

QUALIFICATIONS

·    (2004) Kursus Asas Kontraktor Binaan from Universiti Putra Malaysia.

·    (1996) Mekanik Penyejukbekuan dan Penyaman Udara-Domestik Peringkat Pertengahan from Majlis Latihan Vokasional Malaysia.

·    (1996) Mekanik Penyejukbekuan dan Penyaman Udara-Domestik Peringkat Asas from Majlis Latihan Vokasional Malaysia.

·    (1996) Sijil Pelajaran Malaysia (Vokasional)

EXPERIENCES

·    (2007-2008): TFM ENGINEERING SDN BHD (BRITISH AMERICAN TOBACCO GROUP) : Senior Technician (Air Cond) — Maintaining air conditioning system, pump house, main switch board panel, air washer and chill tank

·    (2006-2007) TFM ENGINEERING SDN BHD (ISTANA MELAWATI, PUTRAJAYA): Technician (Facility Department) — Maintaining air conditioning system, air washer and chill tank. Repairing electrical single phase and three phase’s system.

·    (2003-2005) SYARIKAT HATTA KUANTAN: Supervisor — Supervisor for 15 people for TNB contract works with JKR, DP Elektrik and KASAH Electrical.

·    (2000-2003) I.C.E AIR COND, ELECTRIC AND SERVICES: Technician — air cond repairing for TUDM Bukit Ibam, Hospitak Muazam Shah and MAYBANK. Maintaining Bandar Muazam street lamps, water pump Ladang SAWIRA, Tabung Haji and Felcra.

·    (2000) HOTEL SHANGRI LA, JALAN SULTAN ISMAIL: Technician — Air Cond maintenances.

·    (1999) KIMA SDN BHD:  Technician — air cond and machine maintenance.

 

SUPERVISOR / CLERK OF WORK (ELECTRICAL)

Name: Khairul Nizam bin Ramli

Age: 29 years

QUALIFICATIONS

·    (2003) Sijil Perakuan Kekompetenan sebagai Pendawai (PW4), Wireman NIL from Jabatan Bekalan Elektrik @ Suruhanjaya Tenaga.

·    (2000) Certificate of Technology in Electrical Engineering (Domestic and Industry) from IKM (Institut Kemahiran Mara) at Jalan Kg. Pandan, Kuala Lumpur.

·    (1997) Sijil Pelajaran Malaysia (SPM) from Sek.Men. Taman Maluri Kuala Lumpur.

EXPERIENCES

·    (2007-to Date) : ESHA ENGINEERING CONSULTANTS : Supervisor ( Electrical) — Responsible to supervise work at site and design for submission of electrical services for projects undertaken by the company. Involved with authorities TNB/Majlis Daerah, main contractor and other consultant.

·    (2000-2007) MEDAN KERJAYA SDN BHD: Assistant Electrical Engineer — Responsible for design, tender, submission & cost estimated for the projects undertaken by the company. Involved with contractor, authorities and architect. Supervisor Electrical: Installation, testing & commissioning of electrical worksDraught Person Electrical: Involved in and electrical works for the projects undertaken by the company. Using AutoCAD R10/R12 and manually draught for electrical services in building including the lightning protection system.

·    Routine inspection and checking, servicing and maintenance work for 700 nos TNB substations in Klang Valley

·    Installation and testing and commissioning for electrical services and light fitting for lighting For Bangunan DBKL Dataran Merdeka , Jalan Tun Razak Kuala Lumpur

·    Installation and testing and commissioning for TNB Street lighting projects at Taman Prima Saujana Kajang

·    Design, supervise, installation and testing for compound lighting and street lighting and for Taman Tasik Perdana DBKL Projects.

·    Design, supervise, installation and testing for 4 storey Telecom building in Bukit Sulai. Pahang.

·    Design, supervise, installation and testing for compound lighting and street lighting and for Taman Tasik Permaisuri, DBKL Project.

 

DESIGNER (M&E)

Name: Mastura binti Bidin

Age: 37 years

QUALIFICATIONS

·    (1997) Higher National Diploma (BTEC HND) at Coventry Tech, U.kingdom

·    (1995) Certificate in Mechanical Draughtsman from IKM (Institut Kemahiran Mara) at Jalan Kg. Pandan, Kuala Lumpur

·    (1989) Sijil Pelajaran Malaysia (SPM) from Sek.Men. Lubok China (SMLC) at Malacca

EXPERIENCES

·    (2007-TO DATE)ESHA ENGINEERING CONSULTANTS: Designer (Mechanical) — Responsible for the design, planning, cost estimate and submission of mechanical services for projects undertaken by the company. Involved with authorities JBA/Bomba/Majlis Daerah, main contractor and other consultant.

·    (2005-2006) MISI EKSKLUSIF TRADING : Administration Executive — Responsible for carry out duties indoor such as filling, pick up the phone, tender, monthly salary and other things that related with clerk work.

·    (2002-2004)KBM CONSULT SDN BHD: Assistant Mechanical Engineer — Responsible for design, tender, submission & cost estimated for the projects undertaken by the company. Involved with contractor, authorities and architect.

·    (2000-2002): PERUNDING AME: Project Designer in Mechanical — Responsible for the design, planning, cost estimate and submission of mechanical services for projects undertaken by the company. Involved with authorities JBA/ Bomba/ Majlis Daerah, main contractor and other consultant.

·    (1997-2000) ANGKASA JURUTERA PERUNDING:Assistant Mechanical Designer — Involved in all mechanical services and responsible for sanitary and cold water services complete with the design and submission for projects undertaken by the company. Involved with authorities JBA/Bomba/Majlis Daerah and architect.

·    (1995) PERUNDING TERAS: Draught person Mechanical & Electrical — Involved in all mechanical and electrical works for the projects undertaken by the company. Using AutoCAD R10/R12 and manually draught for mechanical and electrical in building such as fire protection, lightning protection and other services.

 

 

DRAUGHMAN (ELECTRICAL)

SHAHATUDIN BIN EMBY

AGE: 36 YEARS OLD

WORKING EXPERIENCES: 10 YEARS

EDUCATIONAL QUALIFICATION

 

 1990-1992                   : Sekolah Menengah Vokasional, Kulim Kedah.

1993-1995                   :MalaysiaCertificate of Education Polytechnic Sultan Abdul Halim      Mu`adzam Shah, Jitra Kedah.                   (Certificate in Building Services Engineering)

 

 2007-2008                                     :MalaysiaDiploma of Education Polytechnic Sultan Salahuddin Abdul       Aziz Shah, Selangor.

 

(Diploma in Building Services Engineering) 

   ADMINISTRATIVE  STAFF

1. ADMINS EXECUTIVE:

 

SITI AMINAH BINTI MOHD SAAD

AGE: 29 YEARS OLD

EXPERIENCES:  5 YEARS

QUALIFICATION:  DIPLOMA KOMPUTER & ICT , KOLEJ SHAHPUTRA CITY KAMPUS KUALA LUMPUR

 

 

2. ACCOUNT OFFICER

Name: Normala binti Hamzah

Age : 36 years

QUALIFICATIONS

·    (1994) Diploma In Accountancy at EDI, Kuala Lumpur

·    Sijil Pelajaran Malaysia (SPM) from Sek. Men. Keb.Bkt Mendi at Pahang

EXPERIENCES

·    (2007-To Date) : USRAHLITE ENGINEERING (M) SDN BHD : Account — Responsbile for update daily bank statement (recording daily money in and out). Always updated post dated cheques. Prepare pv,receipts,invoices for daily expenses. Updated the utilities (WATER, TNB, and TM) and supplier’s files. Banking Routines.

·    (2005-2006) ADMIRAL COVE DEVELOPMENT SDN BHD : General Clerk — Responsible for indoor duties such as pick up the phone, filling, updates the petty cash expenses and other things that related with clerk work.

·    (2003-2004) KLIK KLAK ADVERTISING AND EVENT TEAM : General clerk — Responsible for indoor duties such as pick up the phone, filling, updates the petty cash expenses and other things that related with clerk work.

·    (1997-2001) TADBIR GEMILANG : General Clerk cum Account Responsible for indoor duties such as pick up the phone, filing, updating the daily petty cash, liaise with suppliers, prepare PV, receipts, invoices for daily expenses and other things that related with clerk and account works.

·    (1994-1996)  ZEQ HOLDING SDN BHD : Account Clerk Responsible for indoor duties such as filling, updates the daily petty cash, liaise with supplies, prepare PV, receipts, invoices for daily expenses and other things that related with account work.

 

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Trackback this post  |  Subscribe to the comments via RSS Feed


Follow

Get every new post delivered to your Inbox.